
Reconstruction and resurfacing of the S.P. 12 between the Polino torrent and the graft with the Olivo dam
Total amount for works € 1.050.527,00
Reconstruction and resurfacing of the S.P. 12 between the Polino torrent and the graft with the Olivo dam
Total amount for works € 1.050.527,00